WINTER SERVICES

WINTERIZING SERVICES

  • 1 - 4 Cylinder Engine..................$235.00 Plus Parts

    6 - 8 Cylinder Engine….............$260.00 Plus Parts

    Includes: Stabilize fuel tanks, lines, carbs or injectors, flush block/heat exchangers, manifolds, drain down all raw water, run on propylene glycol based non-toxic anti-freeze through raw water cooling passages, test all season antifreeze, fog cylinders, corrosion guard all electrical.

  • Merc. Alpha I, Gen II, OMC.....$270.00 Plus Parts

    Bravo I, Bravo II........................$295.00 Plus Parts

    Bravo III, King Cobra................$325.00 Plus Parts

    Includes: Remove outdrive, check alignment, grease

    u-joints, input shaft, gimbal bearing, inspect bellows

    & hoses, change gear oil (synthetic), grease prop shaft & fittings and mount drive back on with new gasket & O-ring.

    Note: I.M.S. will not be responsible if intermediate cable stiffens up over winter months.

  • 2 H.P. to 25 H.P....................$140.00 Plus Parts

       to 100 H.P...........................$185.00 Plus Parts

       to 225 H.P............................$225.00 Plus Parts

       DFI & EFI………....................$265.00 Plus Parts

    Includes: Stabilize fuel tanks, fuel lines, carbs or injectors, flush power head with propylene glycol based non-toxic antifreeze (DFI & EFI Only), fog cylinders, change gear oil (synthetic), grease prop shaft & all fittings and corrosion guard all electrical.

  • 2 H.P. to 8 H.P................$140.00 Plus Parts

    9.9 H.P. to 25 H.P….…....$155.00 Plus Parts

    30 H.P. to 60 H.P............$210.00 Plus Parts

    70 H.P to 130 H.P............$290.00 Plus Parts

    140 H.P. & up...................$320.00 Plus Parts

    All Verado.........................$395.00 Plus Parts

    Includes: Stabilize fuel tanks, fuel lines, carbs or injectors, flush power head with propylene glycol based non-toxic antifreeze, fog cylinders, change engine oil & filter, change gear oil (synthetic), grease prop shaft & fitting and corrosion guard electrical.

  • 2 - 4 Cylinder Engine..................$250.00 Plus Parts

    6 - 8 Cylinder Engine……............$335.00 Plus Parts

    Includes: Fuel treatment, run engine up in temp., flush out all raw water passages, drain & add propylene glycol based non-toxic antifreeze to raw water cooling systems, test engine coolant system for correct P.H. levels & freezing point properties and corrosion guard all electrical.

  • OIL CHANGES

    Gas & Diesel............. Time plus Materials

    Minimum one hour labor per engine

    FRESH & SALT WATER  SYSTEMS AC UNITS / BILGES / HEADS

    Hourly Rate Plus Materials

WINTER STORAGE

NOVEMBER 1ST-APRIL 30TH

  • Call For Availability-Deposit Required

    $13.00 Per Square Foot (Length X Width)

    Swim platforms, engines, pulpits & trailer tongues apply.

    Includes: Hauling, blocks, stands and relaunch plus additional moves into & out of storage building

  • Call For Availability-Deposit Required

    $11.00 Per Square Foot (Length X Width)

    Swim platforms, engines, pulpits & trailer tongues apply.

    Includes: Hauling, blocks, stands and relaunch

  • Up to 30'…….$53.00 Per Foot

    31' & over…...$58.00 Per Foot

    Includes: Hauling, blocks, stands and relaunch

  • Working tongue jacks required

    All Sizes $44.00 Per Foot

    Includes: Hauling within 5 miles of IMS, additional charges may apply outside of that range

  • Up to 25 H.P…………$120.00

    Does not include winterizing

  • (Includes labor for removal and periodic charging)

    Up to 31 Series…………….$65.00 Per Battery

    Not responsible if battery does not hold a charge

SHRINK WRAP

Includes frame and material

Up to 21'................................…......$23.00 Per Foot

22' to 30'........................................$28.00 Per Foot

31' to 40'... ....................................$30.00 Per Foot

41' to 50’…………...........……...........$33.00 Per Foot

51’ and Over……………………………....Call  For Pricing

Doors.............................................$65.00 Each

Boats in Water................………......Additional $250.00

Note: Additional labor will be added for removal of any canvas or accessories. IMS is not responsible for any dry-rotted canvas/cushion/curtain failure or acts of nature.

Due to cost uncertainties from our suppliers, shrink wrap pricing is not guaranteed and subject to change without notice.

LABOR RATES

  • Per Hour.................................................$150.00

    Minimum..................................................$75.00

    *Overtime- after 4:30pm………… ………...$225.00

    *Weekends (4 Hour Minimum)……………$225.00

    *Estimates- credited towards work…...........$200.00

  • Mobile Labor Rate……….$180.00......(1 Hr Minimum)

    *Overtime- after 4:30pm………............……...$270.00

    *Weekends (4 Hour Minimum)…......…………$270.00

    *Estimates- credited towards work…............$200.00

    *Mobilization Fee …........................................$100.00

    All flat rated prices do not include travel time to and from the main service shop. Hourly labor is charged from time to and from I.M.S.

EQUIPMENT RATES

100 Ton Railway.……..$29.00 per ft

(Railway pricing includes 10 days, water & electricity)

Crane Charge......$150.00 per hour plus labor

(2 Person Minimum – Minimum 1 Hour Each Person)

Work Boat (Flat Fee) $200.00 plus labor (1 hr. min)

  • Includes transport from Badgers Island Marina to Island Marine Service

    Includes blocks and stands

    $14.00 per ft. X L.O.A. (Each way)

    Contact us for price quote for transport from other locations

  • Haul/ Relaunch on customer trailer

    Flat Fee of $150.00 each way

  • Boat left on Island Marine Service trailer

    Up to 30’…$15.00 Per Foot X L.O.A.

    31’ to 45’…$17.00 Per Foot X L.O.A.